27/03/2018 |
No.6353/22/V12/RRA/GEN/2018
|
E-in-C |
CGM(All) GMPIU(All) |
Regarding payment of Post-10 works in e-Marg |
27/03/2018 |
No.6350/22/V12/RRA/GEN/2018
|
E-in-C |
CGM(All) GMPIU(All) |
Regarding payment of roads constructed under State Connectivity and Mandi fund in e-Marg |
24/03/2018 |
No.6183/22/V12/RRA/GEN/2018
|
E-in-C |
GMPIU(All) |
Regarding routine maintenance invoice in e-Marg |
07/03/2018 |
No.4933/22/V12/RRA/IT/2018
|
CGM(Fin.) |
GMPIU(All) |
Regarding DSC token for all account officers |
21/02/2018 |
No.3670/22/V12/FA/2018
|
E-in-C |
GMPIU(All) |
Approval of Last time Extension before payment of Final
Bill. |
08/02/2018 |
2696/22/V12/Admin/RRDA/18
|
CGM CO |
CGM(All) GMPIU(All) |
Regarding arrangement of Staff & other
items for PIUs. |
13/09/2017 |
No.20776 |
E-in-C |
GMPIU(All) |
Regarding entry of terminated packages in google sheet |
12/09/2017 |
No.20752 |
CEO |
CGM(All) GMPIU(All) |
----Order---- |
11/09/2017 |
No.20575 |
CEO |
GMPIU(All) |
Regarding maintenance mission duration date 15.09.2017 to 15.12.2017 |
11/09/2017 |
No.20529 |
E-in-C |
GMPIU(All) |
Regarding SSR w.e.f 01.07.17 for post 5 year and post 10 year |
07/09/2017 |
No.20459 |
E-in-C |
GMPIU(All) |
Regarding damages due to rain on roads |
07/09/2017 |
No.20410 |
E-in-C |
CGM(All) |
Regarding "AARAMBH" Mobile App. developed by NRRDA and ILO |
06/09/2017 |
No.20340/22/V12/RRDA/MTN/2017 |
E-in-C |
GMPIU(All) |
Maintenance rates for 5.5 carriage way roads
under PMGSY II. |
06/09/2017 |
No.20274/22/V12/RRDA/MTN/2017 |
E-in-C |
GMPIU(All) |
Rates of Within Five years Maintenance. |
10/08/2017 |
Create E-mail
Forms to be filled
|
CGM(Co.) |
GMPIU(All) CGM |
Create E-mail on NIC
|
03/08/2017 |
No.18394
dated 03.08.2017 |
E-in-C |
GMPIU(All) |
Payment via eMarg
|
03/08/2017 |
No.18390
dated 03.08.2017 |
E-in-C |
GMPIU(All) |
eMarg data entry
|
03/08/2017 |
No.18392
dated 03.08.2017 |
E-in-C |
GMPIU(All) |
Payment via eMarg
|
27/7/2017 |
No.18008
dated 27.7.2017 |
CEO |
GMPIU(All)
CGM(All) |
Corrigendum on Order No. 5.
|
27/7/2017 |
18014/22/V12/IT/2017 |
E-in-C |
GMPIU(All)
CGM(All) |
Important Instruction of OMMAS/eMarg/eTender .
|
24/7/2017 |
No.17770/2017 |
CEO |
GMPIU (All) |
Payment of Construction Work under PMGSY. |
20/07/2017 |
11516/22/V12/RRDA/2017
Corrigendum1
Additional Point
|
E-in-C |
GMPIU (All)
CGM (All) |
Regarding Process & Format For Award. |
07/07/2017 |
Letter No 16686 dt 7/07/2017 |
E-in-C |
CGM (All) |
Regarding last time extension and liquidated damages. |
10/7/2017 |
No.16719/22/V12/FA/2017 |
CEO |
GMPIU (All) CGM (All), |
Regarding Road Damage due to rain. |
5/7/2017 |
No.16493/22/V12/2017 |
CEO |
GMPIU (All) CGM (All), |
Regarding Works during the Rainey Season |
29/6/2017 |
No.15924/22/V12/GM-CN/2017 |
CEO |
GMPIU (All) CGM (All), |
Regarding Shifting of Electric Line Under PMGSY.
|
27/6/2017 |
No.15786/FA/2017 |
CEO |
GMPIU (All) CGM (All), GMT (All) |
------Order------. |
01/5/2017 |
No.15535/FA/2017 |
CEO |
GMPIU (All) CGM (All), GMT (All) |
------Order------. |
23/6/2017 |
No.15489/FA/2017 |
CEO |
GMPIU (All) CGM (All), GMT (All) |
Time limit for NOC from Mining. |
23/6/2017 |
No.15487/FA/2017 |
CEO |
Commissioner (All). Collector (All)),
CGM (All) |
Time limit for NOC from Mining. |
21/6/2017 |
Order No.12358/2017 |
CEO |
GMPIU (All) CGM (All), GMT (All) |
Delegation of Power . |
14/6/2017 |
No.14734/22/V12/2017 |
E-in-C |
GMPIU (All) CGM (All) |
Maintenance of MDR declared by PWD . |
14/6/2017 |
No.14676/22/V12/IT/2017 |
E-in-C |
GMPIU (Concerned) CGM (All) |
National GIS. |
6/6/2017 |
14199/22/V12/EinC/2017 |
E-in-C |
GMPIU (All) CGM (All) |
Use of Manufactured Sand in Cement Concrete Work. |
1/6/2017 |
No.13826/22/V12/T8/2017 |
E-in-C |
GMPIU (All) CGM (All) |
Regarding Road Safety. |
26/5/2017 |
No.13412/22/V12/FA/2017 |
E-in-C |
GMPIU (All) CGM (All) |
Regarding Time Extension & Liquidity Damages. |
26/5/2017 |
No.13411/22/V12/GMT-CN/17 |
E-in-C |
GMPIU (All) CGM (All) |
Regarding Electric Pol Shifting under PMGSY. |
24/5/2017 |
No.13243/22/V12/T5/2017 |
E-in-C |
GMPIU (All) CGM (All) |
Direction regarding New Technique of Penal
Concrete under PMGSY. |
17/5/2017 |
No.12893/22/V12/IT/2017
Click Here:
Data Download |
E-in-C |
GMPIU (All) CGM (All) |
National GIS. |
08/5/2017 |
No.12065 |
E-in-C |
GMPIU (All) CGM (All) |
Mistakes in the data entry of e-Marg |
11/5/2017 |
No.12266 |
CEO |
GMPIU (All) E-in-C CGM (All) |
Recovery of Mobilization and machinery advance |
06/5/2017 |
No.12017 |
CEO |
GMPIU (All) E-in-C CGM (All) |
Provision for Validation of Bank Guarantee in OMMAS |
03/5/2017 |
No.11710 |
CEO |
GMPIU
(All) |
Producing wrong account number of contractors |
11/5/2017 |
12254/22/v-12/RRDA/Maint-1/17 |
E-in-C |
GMPIU
(All) |
PMGSY Road Safety |
08/5/2017 |
12068/22/V12/RRDA/MTN1/2017
Encl: Enclosure |
E-in-C |
GMPIU
(All)
CGM (All) |
Necessory Board for Roads under Maintenance. |
01/04/2017 |
No. 9574 Dt. 01/04/2017
|
CEO |
CEO(ZP)(All)GMPIU
(All) |
Vehicle providing order to Nodal Officers |
01/05/2017 |
No. 11537 Dt. 01/05/2017 |
CEO |
E-in-CGMPIU
(All) CGM (All) |
Order |
01/05/2017 |
Liquidated Damages(No. 11539) |
CEO |
GMPIU
(All) |
Liquidated Damages order |
26/4/2017 |
No. 11165 Dt. 26/4/2017 Maintenance Letter |
E-in-C |
GMPIU
(All)
CGM (All) |
Maintenance Letter |
28/4/2017 |
No.11463 PIU Open/Close Order |
C.E.O |
GMPIU
(All)
CGM (All) |
Order |
20/4/2017 |
No.10643/RRDA/2017
|
C.E.O |
GMPIU
(All)
& CGM (All) |
Regarding Electric pole. |
16/3/2017 |
8453/22/V12/FA/2017
|
C.E.O |
GMPIU
(All)
& CGM (All) |
----Order-------. |
9/3/2017 |
4079/22/V12/RRDA/PMGSY-II/17
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Update the DRRP on OMMAS for PMGSY-II. |
22/2/2017 |
2891/22/V12/RRDA/T8/GMT8/17
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Social, Environmental Safeguard & Road Safety in PMGSY-II |
16/2/2017 |
2536/22/V12/RRDA/E-5-51/17
|
CGM(Co.) |
GMPIU
(All)
& CGM (All) |
Order Regarding Asst Public Information Office under
RTI. |
21/12/2016 |
25389/22/V12/RRDA/GMTCN/16
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Electric Pol Shifting Tender through e-Tendering. |
7/12/2016 |
24920/22/V12/RRDA/GMT5/2016
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Payment through e-Marg. |
15/11/2016 |
23166/22/V12/RRDA/T1/531/16
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding 7.5 meter width of the Road. |
5/11/2016 |
22753/22/V12/RRDA/IT/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Entry on OMMAS |
27/10/2016 |
22421/22/V12/RRDA/GMT5/2016
Encl: Encl1
Encl: Encl2 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Permission of Renewal work |
01/11/2016 |
22423/22/V12/RRDA/2016
Encl: Encl1 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Achievement of Milestone |
27/10/2016 |
22254/22/V12/RRDA/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Guidelines for state to become eligible for Financial
Incentives for the Year under PMGSY. |
20/10/2016 |
21718/22/V12/GMT5/CO/16 |
E-in-C |
CEO Jila Panchyat
(All)
& CGM (All) |
Sub Engg. from CMRHM to MPRRDA |
17/10/2016 |
21399/22/V12/GMT5/MTN/16
Encl: Encl1 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Draft BOQ for within 5 Year Tender. |
17/10/2016 |
21404/22/V12/FA/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Difference between New & Old Tender
document of PMGSY. |
7/10/2016 |
21118/22/V12/RRDA/Admin/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Vehicle Arrangement of PIUs . |
4/10/2016 |
20830/22/V12/T2/R&D/454/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Works of R& D (Plastic Waste &
others) under PMGSY. |
3/10/2016 |
20821/22/V12/RRDA/GMT5/2016
Encl:
Enclosure |
E-in-C |
GMPIU
(All)
& CGM (All |
Renewal Work on road. |
3/10/2016 |
20823/22/V12/RRDA/GMT5/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Direction of Model Roads under
Maintenance. |
3/10/2016 |
20825/22/V12/RRDA/GMT5/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Maintenance of roads |
3/10/2016 |
20784/22/V12/RRDA/GMT5/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Maintenance of roads without agency. |
23/8/2016 |
18027/22/V12/RRDA/T1/554/16 |
C.E.O |
GMPIU
(All)
& CGM (All) |
------Order--------- |
16/8/2016 |
17723/22/V12/RRDA/GMT5/MTN/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Tenders of within 5 Years
Maintenance. |
8/8/2016 |
17391/22/V12/MPRRDA/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Single Tender in First Call of NIT. |
23/7/2016 |
16447/WB/MPRCP/MPRRDA/16 |
E-in-C and Project Director(MPRCP) |
GMPIU
(All)
& CGM (All) |
Instructions for MPRCP DPR preparation. |
28/7/2016 |
16679/22/V12/T2/554/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Width of Rroads. |
20/7/2016 |
16008/22/V12/RRDA/Gmt5/Mtn/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding data entry & e-payment on
e-Marg. |
23/6/2016 |
14187/22/V12/RRDA/T1/569/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding URS (Unified Road System). |
25/5/2016 |
11821/22/V12/RRDA/Ac/16 |
C.E.O |
GMPIU
(All)
& CGM (All) |
Bills of Pre 5 Maintenance on e-Marg. |
10/5/2016 |
10075/22/V12/RRDA/Ac/16
|
C.E.O |
CGM (All) |
Bank authorization for maintenance
head |
6/5/2016 |
9971/22/V12/RRDA/Ac/16
|
C.E.O |
GMPIU
(All)
& CGM (All) |
e-Marg Training for post5 years MTN. |
2/5/2016 |
9282/22/V12/RRDA/Ac/16
|
C.G.M. (F) |
GMPIU
(All)
& CGM (All) |
Regarding Hiring of the Vehicle. |
2/5/2016 |
9210/22/V12/RRDA/Ac/16 |
C.G.M. (F) |
GMPIU
(All)
& CGM (All) |
Regarding Proper Maintained of Bank
Guarantee. |
2/4/2016 |
7398/22/V12/RRDA/IT/16
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Mobile App for progress & Lab
photographs. |
24/02/2016 |
3752/22/V12//T1/592-part/16
Encl:
Format 1,2,3,4
Encl:
Form A&B (CNCPL)
Encl:
Form A&B (CUPL) |
CGM-1 |
GMPIU
(All)
& CGM (All) |
Proposals of 2016-17 Batch1 and Batch 2. |
12/02/2016 |
3147/22/V12/RRDA/T1/CN/16 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Confirmation of Habitation Data on
OMMAS. |
25/01/2016 |
1807/22/V12/T1/592/2016
Encl:
Encl |
E-in-C |
GMPIU
(All)
& CGM (All) |
Remaining proposals of CNCPL &
CUPL. |
13/01/2016 |
714/22/V12/T1/554/2016 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Payment after Bitumen Bill. |
12/1/2016 |
668/22/V12/RRDA/IT/2016
Encl:
Instruction
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Mobile App for progress & Lab
photographs of OMMAS. |
23/12/2015 |
24420/22/V12/RRDA/IT/2015
Encl:
Compare Sheet
|
C.E.O |
GMPIU
(All)
& CGM (All) |
Fully update the OMMAS. |
18/12/2015 |
23138/22/V12/T1/554/2015 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Work with WMM instead of WBM. |
10/12/2015 |
23576/22/V12/RRDA/T1/29/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Uploading Photographs of ongoing
PMGSY Roads on OMMAS. |
1/12/2015 |
22826/22/V12/RRDA/GMT5/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Rate of the Routine Maintenance after
5 years MTN.. |
1/12/2015 |
22889/22/V12/RRDA/IT/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Fully update the OMMAS. |
28/11/2015 |
22593/22/V12/RRDA/GMT5/15
Encl:
Enclosure |
E-in-C |
GMPIU
(All)
& CGM (All) |
Review of the MTN works on eMARG. |
13/11/2015 |
21843/22/V12/gmt3/adb/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Protection of good Samaritans at the
time road accident. |
31/10/2015 |
20800/22/V12/T1/554/circular/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding
Utility Pipe & Field Pipe under PMGSY. |
Kind Attention to ALL GMPIUs &
DEOs:
Please ensure to update Physical/Financial Progress
(completed Roads/Completed Length & Expenditure) upto Sep'15 on OMMAS
by 31st Oct'15.
Click here for:
Difference of OMMAS & MPR |
8/10/2015 |
19392/22/V12/MPRRDA/IT/2015 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Habitation Reconciliation on OMMAS
|
28/08/2015 |
16835/22/V12/T1/414/circular/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Construction of C.C. Drain. |
Click here for:
New Digital
Signature Certificate Form (Sify)
|
21/08/2015 |
16116/22/V12/T1/554/circular/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Don't Use CC Pavement M-30 in Dowel
Bars. |
12/08/2015 |
15670/22/V-12/MPRRDA/IT/2015
Encl:
Form |
C.G.M. (F) |
GMPIU
(All) |
Regarding Digital Signature Certificate. |
15/07/2015 |
13372/22/V-12/Tech/QC/T4/2015 |
C.E.O |
GMPIU
(All)
& CGM (All) |
Quality Control Register |
7/07/2015 |
13086/22/V12/RRDA/Ac/2015 |
C.E.O |
GMPIU
(All)
& CGM (All) |
Regarding Hire the Vehicles for
Inspection in PIUs |
4/07/2015 |
12904/22/V12/RRDA/T1/2015 |
|
GMPIU
(All)
& CGM (All) |
Necessary work before Invite the Tenders
of road works. |
3/07/2015 |
12831/22/V12/Ac/RRDA/2015 |
C.G.M. (F) |
GMPIU
(All)
& CGM (All) |
Bank Reconciliation. |
3/07/2015 |
12857/22/V12/Circular/T2/2015 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Deviation Cases under PMGSY. |
2/07/2015 |
12727/22/V12/MPRRDA/T3/2015
Encl:
Format |
E-in-C |
GMPIU
(All)
& CGM (All) |
Information of Road Safety. |
1/07/2015 |
12612/22/V12/FA/Cir./2015 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Post 5 Year Repair
Maintenance. |
17/06/2015 |
11471/22/V12/GMT3/Tech/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Use the Material in
Filling. |
15/06/2015 |
11218/22/V12/MPRRDA/Acct/15 |
C.G.M. (F) |
GMPIU
(All)
& CGM (All) |
Technical & Accounts
Inspection of PIUs. |
26/05/2015 |
9745/22/V12/MPRRDA/2015
Encl:
PCI
Data |
C.G.M.1 |
GMPIU
(All)
|
To update the PCI in OMMAS |
26/05/2015 |
9683/22/GMT5/MPRRDA/MTN/15 |
C.E.O. |
GMPIU
(All), CGM (All) |
Inspection & Photo Uploading in e-Marg |
11/05/2015 |
8528/22/T3/MPRRDA/15 |
C.G.M.1 |
GMPIU
(All)
|
Gender Action Plan of ADB Works. |
05/05/2015 |
8273/22/V12/T2/RnD/454/15
Encl:
Instructions |
E-in-C |
GMPIU
(All)
& CGM (All) |
Innovative Technology Roads Entry on
OMMAS. |
28/04/2015 |
1618/22/V12/MPRRDA/T3/2015 |
C.E.O. |
GMPIU
(All), CGM (All) |
Regarding Diversion. |
31/03/2015 |
6185/22/V12/RRDA/IT/2015
Encl:
Format
click here for :Wrongly
Mapped habitation UC on Upgradation Road and C on New Road
in OMMAS |
C.G.M.1 |
GMPIU
(All)
|
Habitation Mapping on OMMAS. |
27/03/2015 |
5923/22/V12/RRDA/Acct/2015 |
C.E.O. |
GMPIU
(All), CGM (All) & AO(All) |
Accounts Preparation of State Funds. |
26/03/2015 |
5785/22/V12/RRDA/Acct/2015 |
C.E.O. |
GMPIU
(All), CGM (All) & AO(All) |
Regarding payment of State Share
under PMGSY |
25/03/2015 |
5739/22/V12/RRDA/Acct/2015 |
C.E.O. |
GMPIU
(All), CGM (All) & AO(All) |
Arrangement for Payment of
Construction work. |
19/03/2015 |
5277/22/V12/RRDA/FA/2015 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Supervision of Maintenance
works. |
Kind Attention to ALL GMPIUs
(Concerned):
Please ensure to update Innovative Technology
Details on OMMAS by 25-03-2015
(Go to the proposal mode =>Plus sign of Technology Details of
the road => form will appear for entering chainage wise
technology/Layer & cost details)
Click here for:
Circular |
7/03/2015 |
4175/22/V12/RRDA/G1/15 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Defaulter
Contractors List. |
4/03/2015 |
3839/22/V12/E-3-12/2015 |
C.G.M. (Co.) |
GMPIU
(All)
& CGM (All) |
Regarding Contract person
information. |
3/03/2015 |
3010/22/V12/T1/332/2015 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Priority in the Selection
of roads under SAGY. |
2/03/2015 |
3779/22/V12/RRDA/Ac/2015 |
C.G.M. (F) |
GMPIU
(All)
& CGM (All) |
Recovery of
Mobilization/Machinery Advance. |
7/2/2015 |
2351/22/V12/T2/Circular/2015 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Deviation Cases. |
27/1/2015 |
1663/22/V12/RRDA/GMT5/15 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding MTN Rate for
Cement Concrete Pavement. |
14/1/2015 |
1049/22/V12/T7/2015
Encl:
Encl-1 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Direction & Instruction to
prepare the Original Bridge Report & Inspection Report. |
13/1/2015 |
774/22/V12/RRDA/IT/2015 |
CGM-1 |
GMPIU
(All)
|
OMMAS. |
7/1/2015 |
472/22/V12/FA/circular/2015 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Completion
Certificate & Final Bill. |
24/12/2014 |
25113/22/V12/FA/circular/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding to return the EMD
of Contractor's. |
24/12/2014 |
25082/22/V12/T1/circular/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Necessary instruction
before calling the NIT. |
11/12/2014 |
24131/22/V12/T1/circular/14 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Construction of C.C. Drain. |
Kind Attention to ALL GMPIUs &
DEOs:
Please ensure to update Physical/Financial Progress
(completed Roads/Completed Length & Expenditure) upto Oct'14 on OMMAS
by 24th Nov'14.
Click here for:
Difference of OMMAS & MPR |
17/11/2014 |
22455/22/V12/T1/circular/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Deviation. |
10/11/2014 |
22046/22/V12/RRDA/GMT5/2014 |
E-in-C |
GMPIU
(All)
& CGM (All) |
e-Marg. |
01/09/2014 |
DO NO. 21561 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
----DO Letter---- |
27/09/2014 |
19502/22/V12/T4/QC/S-68/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Direction For Stage Passing
Activities. |
27/09/2014 |
19541/22/V12/RRDA/T1/29/14 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Amendment to Para 6.13 &
8.4(i) of PMGSY Programme Guidelines. |
Kind Attention to ALL GMPIU:
Proposals under 2014-15, Batch-1 should be
cleared by STA on OMMAS latest by 16.09.2014 (5:30 PM). The status
will be monitored in GMs review meeting. |
02/09/2014 |
15898/22/V12/RRDA/2014 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding HRA for retired
contractual employee. |
5/09/2014 |
17805/22/V12/RRDA/GMT5/2014 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Renewal work in Post 5
years. |
5/09/2014 |
17767/22/V12/RRDA/CGM12014 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Proper Documentation of
Maintenance. |
01/09/2014 |
17606/22/V12/RRDA/2014
Encl1:
Encl1
Encl1:
Encl2 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Crust Revision of the road
due to heavy Vehicle. |
02/08/2014 |
15898/22/V12/RRDA/Ac/13-14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
----------order------------- |
08/07/2014 |
14907/22/V12/RRDA/T1/454/14 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Performance Evaluation in
R& D Works. |
05/07/2014 |
14135/22/V12/RRDA/T1/210/14 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Important Decision in 48th
E.C. of MPRRDA. |
27/06/2014 |
13335/22/V12/RRDA/IT/14Imp |
C.G.M.2 |
GMPIU
(All)
& CGM (All) |
Identity Card of PIU
officials |
23/06/2014 |
13073/22/V12/RRDA/IT/14 |
C.G.M. (F) |
GMPIU (All) & CGM (All) |
Write off the Computer
Hardware & Purchase at PIUs. |
23/06/2014 |
13071/22/V12/RRDA/IT/14 |
C.G.M. (F) |
GMPIU (All) & CGM (All) |
AMC of Computer Hardware
for PIUs |
23/05/2014 |
10785/22/V12/RRDA/T1/266/14Imp |
E-in-C |
GMPIU
(All)
& CGM (All) |
OMMS-Habitation |
24/05/2014 |
10829/22/V12/RRDA/2014 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Renewal in Post 5 years &
Tarring in New Roads. |
19/05/2014 |
10455/22/V12/T2/Circular/14
Encl1:
Encl1 |
C.G.M.1 |
GMPIU
(All)
|
Regarding Package
Saving. |
19/05/2014 |
10432/22/V12/Tech/QC/T4/S68/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Quality of Cement
Concrete Pavement Work under PMGSY. |
13/05/2014 |
10093/22/V12/RRDA/IT/2014 |
C.G.M.1 |
GMPIU
(All)
|
Regarding Digital Signature
- USB Token from NIC. |
05/05/2014 |
9610/22/V12/T1/432-part/14
Encl1:
Encl1
Encl2:
Encl2
|
C.G.M.1 |
GMPIU
(All)
|
Proposal Entry of
2014-15 batch1 in OMMAS.. |
28/04/2014 |
7173/22/V12/Tech/QC/T4/S65/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Road selection of SQM's
inspection. |
25/04/2014 |
7063/22/V12/Tech/QC/T4/S68/14 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Quality of cement
concrete pavement work
under PMGSY. |
22/04/2014 |
6819/22/V12/T2/Circular/2014 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Regarding Deviation
under PMGSY. |
21/04/2014 |
6673/22/V12/RRDA/IT/14 NEW
Encl:
Enclosure
|
E-in-C |
GMPIU
(All) |
To Verify contractor PAN & details for e-Management
of Maintenance Work. |
11/04/2014 |
6391/22/V12/MPRRDA/2014 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Amendment No. 13 in SBD
of PMGSY. |
10/04/2014 |
6336/22/V12/RRDA/IT/2014
Encl:
Enclosure |
G.M. (Co) |
GMPIU
(All)
& CGM (All) |
Information of
Computer/Hardware. |
04/04/2014 |
6034/22/V12/RRDA/T1/266part/14
Encl:
Enclosures |
C.G.M.1 |
GMPIU
(All)
|
Comprehensive data of Habitation in OMMAS. |
03/04/2014 |
5997/22/V12/RRDA/GMT5/MTN/14 |
E-in-C |
GMPIU
(All)
& CGM (All) |
To Implement the SOR (15.08.2014) in
Maintenance Work. |
19/03/2014 |
5337/22/V12/RRDA/GMT5/2014
NEW(IMP) |
E-in-C |
GMPIU
(All)
& CGM (All) |
e-Management
for Maintenance Work. |
12/03/2014 |
5017/22/V12/RRDA/IT/2014
NEW(IMP) |
C.G.M. (Fin) |
GMPIU
(All)
|
Regarding Digital Signature (E-Token) |
28/02/2014 |
3813/22/V12/RRDA/IT/13NEW(IMP)
Encl:
Enclosures |
C.G.M.1 |
GMPIU
(All)
|
Discrepancy of Habitation in
OMMAS. |
21/01/2014 |
1352/22/V12/FA/Circular/14NEW |
C.G.M.1 |
GMPIU
(All)
|
Regarding List of the Defaulter
Contractor's |
02/01/2014 |
59/22/V12/RRDA/IT/2014
Encl:
Enclosure |
C.G.M.1 |
GMPIU
(All)
|
To Prepare the DSC on E-Token. |
03/01/2014 |
119/22/V12/RRDA/T1/412/14
Encl:
Enclosure3 |
C.G.M.1 |
GMPIU
(All)
|
Connected/
Unconnected Villages on OMMAS. |
Correct the Core network
& C/
UC Villages on OMMAS.
(Lock is open from 30th Dec13)
Click
here for:
Annexure1 |
22/11/2013 |
19223/22/V12/RRDA/IT/2013
|
E-in-C |
GMPIU
(All)
& CGM (All) |
Prepare DSC on E-Token & Mapping on New
e-tender Portal. |
06/11/2013 |
18391/22/V12/RRDA/IT/2013 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Correct the Core network
& Connected/
Unconnected Villages on OMMAS.
(Lock open from 6th Nov13) |
Form
A & B of the Proposal 2013-14 Batch1 |
A.
Proposal2013-14, Batch-1, PMGSY, 669 Roads
B.
Proposal2013-14, Batch-1, R&D, 22 Roads
|
21/10/2013 |
17674/22/V12/RRDA/IT/2013
Encl1:
Abstract
Encl2:
Format |
E-in-C |
GMPIU
(All)
& CGM (All) |
Correction of Connected/
Unconnected Villages on OMMAS. |
15/10/2013 |
17639/22/V12/FA/2013 |
C.E.O. |
GMPIU
(Concerned) |
Regarding Recovery from the
Contractor's. |
14/08/2013 |
13788/22/V12/RRDA/T2/2013 |
C.G.M.1 |
GMPIU
(All)
|
Regarding Deviation Cases. |
12/08/2013 |
13717/22/V12/RRDA/T2/2013
Encl:
Enclosure |
C.G.M.1 |
GMPIU
(All)
|
Regarding Deviation under
PMGSY. |
Click
here for:
Circular regarding Price Adjustment Clause dated 14.9.2011 |
Click
here for:
Minutes of the Review Meeting dated 27-28 July2013 |
22/07/2013 |
12116/22/V12/FA/2013 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Modification in the duty
& responsibility of GM/AM/SubEng . |
Click
here for:
Cencus 2001 Data For
Office Use in Excel |
09/07/2013 |
11608/22/V12/RRDA/CGM3/2013 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Setting Out,
OGL & Bench Mark of Road Construction. |
08/07/2013 |
11535/22/V12/Circular/2013 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Insurance from
Contractors under PMGSY. |
08/07/2013 |
11517/22/V12/FA/Circular/2013 |
C.E.O. |
GMPIU
(All) |
Recovery from the
Contractor after termination of the Agreement. . |
28/05/2013 |
10878/22/V12/RRDA/T1/412/13
Encl:
Enclosure
NEW (IMP)
|
C.G.M.1 |
GMPIU
(All)
|
Connected/Unconnected
Habitations @2001 under PMGSY . |
7/06/2013 |
9541/22/V12/RRDA/GMT-5/2013
NEW |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Maintenance under PMGSY. |
22/05/2013 |
8515/22/V12/FA/Circular/2013
NEW |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Single Tender
in 1st Call. |
22/05/2013 |
8451/22/V12/RRDA/T1/29/13 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Guidelines on Technology
Initiatives Under PMGSY. |
20/05/2013 |
8357/22/V12/RRDA/T1/2013
Encl:
Enclosure |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Revision of core network
to include left out habitation
follow up action. |
20/05/2013 |
8359/22/V12/RRDA/T1/273/13 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Basic Road Statistics. |
16/05/2013 |
8173/22/V12/RRDA/IT/2013 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Update the GIS
(i-GeoApproach). |
08/05/2013 |
7857/22/V12/RRDA/GMT-5/2013
Encl:
Enclosure
|
C.E.O. |
GMPIU
(All)
& CGM (All) |
To feed the Maintenance
Entry on OMMAS. |
07/05/2013 |
7784/22/V12/Tech/QC/T4/S41/13
|
S.Q.C. |
GMPIU
(All)
& CGM (All) |
To Establish the Field Lab
by Contractor's. |
2/05/2013 |
7380/22/V12/FA/Circular/2013
|
C.E.O. |
GMPIU
(All)
& CGM (All) |
Procedure of NIT of Balance
Work . |
26/04/2013 |
6984/22/V12/Estt./2013
|
G.M. (Coord) |
GMPIU
(All) |
Interview for the post of
Asst. Manager.. |
18/04/2013 |
6623/22/V12/Tech/QC/T4/M02/13
|
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Mining under
PMGSY/MMGSY. |
16/04/2013 |
6452/22/V12/FA/Circular/2013
|
C.E.O. |
GMPIU
(All)
& CGM (All) |
Put the Contractors Name in
Debarred List.. |
06/04/2013 |
6084/22/V12/RRDA/IT/2013
Encl:
Enclosure |
G.M. (Coord) |
GMPIU
(All)
& CGM (All) |
Information of
Computer/Hardware. |
30/03/2013 |
5671/22/V12/FA/Circular/2013 |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding tender of the
balance work. |
30/03/2013 |
5631/22/V12/FA/Circular/2013
Encl1:
Enclosure |
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding of
Cancelled Agreement from Contractors.. |
23/03/2013 |
5262/22/V12/Tech/QC/T4/N52/13
|
C.E.O. |
GMPIU
(All)
& CGM (All) |
Regarding Quality of the
Construction Work. |
8/03/2013 |
4181/22/V12/RRDA/Tech/QC/13 NEW
|
S.Q.C. |
GMPIU
(All) |
Regarding the Selection of
roads for Inspection of NQMs. |
11/02/2013 |
2625/P&RD/2013 |
A.C.S. |
GMPIU
(All)
& CGM (All) |
Regarding Quality of New
Roads Construction & Maintenance. |
1/02/2013 |
1988/22/V12/RRDA/IT/2013 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Important Instruction- Connected/
Unconnected Villages on OMMAS. |
16/01/2013 |
766/22/V12/T2/RRDA/2013 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Instructions regarding
Items to be used
under CMGSY. |
15/01/2013 |
680/22/V12/T2/RRDA/2013 |
E-in-C |
GMPIU
(All)
& CGM (All) |
Quality of Hume Pipes
under PMGSY. |
Click
here for:
SEIAA
Parishist For Mining |
8/01/2013 |
441/22/V12/RRDA/IT/2013
Encl1:
Enclosure |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
For Connected/
Unconnected Villages on OMMAS. |
8/01/2013 |
425/22/V12/RRDA/IT/2013 |
C.G.M.1 |
GMPIU
(All)
& CGM (All) |
Mapped the Link Route in
Sanctioned Road in OMMAS. |